Long Knit sweater with braids




Long Knit sweater with braids
Size: 36/38, 40/42, 44/46.

Materials: 850 (900/1000) g of yarn Gedifra Extra Soft Merino (100% merino wool, 50g / 105m) needles and circular needles 40 cm long № 4.5 - 5.5. supporting spokes

Types of bindings:
Gum 3/3: 3 alternately persons., 3 PHI.
the front surface of: people. P - lits.p., PHI. R. PHI. P.
the basic pattern: the number of loops is a multiple of 6.
1-2 th p .: individuals. surface.
3rd p .: * snyat 3 p. In the Aux. needle, leave for work, 3 persons., then 3 persons. with aux. spokes rep. from *.
4-10 th p .: individuals. surface.
11 th p .: * snyat 3 p. Vspom.spitsu to leave before work, 3 persons., Then 3 persons. n. Wed Aux. spokes rep. from *.
12-16 th p .: individuals. surface.
Repeat height 1-16 minutes p.

The density of knitting: the basic pattern, 27-28 p. 26 and p. = 10 cm.

Knitting long sweater

The back of the long sweater knitting.
Dial 128 (140/158) n. 16 cm and knit elastic band 3/3, while in the 1st PHI. R. start with edge, 3 persons. and finish with 3 PHI. and chrome. In the latter PHI. R. add to both sides. 1 pt = 130 (142/160) n.

Then knit the trail: 1 chrome., 1 p. People. quiet, 126 (138/156) n. axis. pattern 1 n. persons. surface, 1 chrome.
Within 54 (52/50) cm from the beginning of the armhole to close on both sides on 4 sts., Then every 2-m p. 3 x 2 p. And 2 x 1 n. 106 Total (118/136) n.

Through 70 cm from the start of the neck close to the average 42 (42/48) n., Then to round off the cut in each close 2nd district. 3 times 3 sts., 1 times 2 n.
Through 74 cm from the beginning of work close to each arm 21 (27/33) p.

Shelve knitting long sweater
Knit as the back, but after 67 cm from the start of the neck to close the medium 24 (24/30) n., And then at each side of the notch close at every 2 p. 1 times 5 p., 1 times 4 p., 1 time 3 sts., 3 times 2 n. 2 times and 1 st.
Through 74 cm from the beginning of work close to the shoulder at 21 (27/33) p.

Sleeve Knit long sweater
Dial 80 n. And knit 2 cm elastic 3/3, starting in the 1st PHI. R. 1 chrome. and 3 persons. and finished with 3 PHI. 1 chrome.
Then knit 19 p. osn.uzorom. After 3 crossings continue elastic loops 3/3, as in the beginning.
After 19 cm to continue the basic pattern, adding in the 4th district. for bevel sleeves on both sides 1 st., then add 1 p. 7 times in each 8-m p. (6 times every 6 m, 6 times every 4th / 12 times in every 4 th, 6 times every 2 m) = 96 (106/118) n.

After 45 cm from the beginning of work to close doused both sides on 4 sts., Then every 2-m p. 3 x 2 p. 14 (13/10) times in 1 pt. 1 (2/5) times 2 n. 1 times 4 n. Then close the remaining 36 (44/50) p. Total height 60 cm.

Second hand to perform similarly.

End of work.
Run all connecting seams, sew sleeves.
On the neck on circular needles dial 138 (138/150) n., And set aside.
On the other circular needles for Bakey Golovins new dial 138 (138/150) p. 3/3 and knit elastic band, starting with 3-PHI. and finished with 3 persons. P.

After the third p. knit 19 p. DOS. pattern, then again elastic 3/3. After 15 cm from the start of the loop return, pending aside and knit 2 p. People together., Taking a noose from the neck and 1 loop with inlay for the neck. Knit 3 p. persons. embroidery. Then sew the loop with PHI. hand edge of the closing cap.